The project
As part of a national housing initiative, a residential complex is being developed in Al Awir First, Dubai.
This project reflects an ongoing commitment to enhancing family stability and improving living standards through the creation of thoughtfully planned residential communities.
Keller was assigned to carry out ground improvement works by Rapid Impact compaction and Rigid Inclusions.
The challenge
The main challenge of the project was completing the entire area within the given timeframe while working adjacent to live utilities, including a water line.
Additionally, the presence of loose soil and varying depths of required ground improvement added complexity to the execution.
Keller achieved the project design criteria by adopting precautionary measures and design solutions.
The solution
Keller implemented the most effective ground improvement techniques to meet the required design criteria within the allocated schedule by taking into consideration the proximity for exiting utilities and depth of loose soil.