Contiguous pile walls consist of piles arranged in a way that a gap remains between the piles. Where required the soil between the piles can be stabilised during excavation by either installing timber lagging in front of the excavated soil or by building a reinforced shotcrete or concrete block wall towards the excavated soil surface. Alternatively injection grouting can be carried out in advance of the excavation in order to solidify the soil between the piles.
Process
Contiguous pile walls retained by anchors or strutting systems are often supported by a waler beam to distribute the loads (and prevent anchors/struts from punching through the infill) and as a mitigation measure for the unlikely event of an anchor/strut not carrying the load. This waler beam can be constructed as a reinforced concrete beam casted towards the pile wall, or by using steel profiles fixed to the piles and anchors/strutting systems.
Common uses
- Slope stabilisation
- Support bulkheads
- Support of excavations
Advantages
- Limited load from surrounding structures taken
- Less vibration during construction
Quality assurance
We use the latest technology, testing regimes and best practices protocols developed over many years to ensure the position, verticality and structural integrity of our pile walls.
Related techniques
Related projects
Infrastructure
Al Jasra Interchange – Loop Road Widening
Micro pile wall to widen road section under a bridge.
Commercial and leisure
Future Generation Reserve Tower
38-Storey LEED Certified Project at the gateway of Bahrain Bay.
Residential
Golden Gate
The Golden Gate aims to be the tallest free-hold residential towers in Bahrain.