Bored piles are a very effective, state-of-the-art construction element with many applications in foundation and civil engineering.
Process
A temporary casing is installed and soil drilled out using specialised tools. If the hole requires support to remain open, additional casing or drilling fluid can be used. Full length reinforcing steel is lowered into the hole which is then filled with concrete. Bored piles can be drilled to depths in excess of 60m and typical diameters range up to 2.4m.
Common uses
- As heavy foundations, securing deep excavation especially close to existing buildings as well as stabilising and retaining slopes
- In a variety of infrastructure projects such as tunnelling, road or bridge construction as well as flood protection
- Retain ground alongside an excavation pit or close to adjacent buildings, often combined with other techniques such as ground anchors or soil nails
- For slope stabilisation to prevent landslides, or protect existing buildings
Advantages
- Very high load capacity
- Various diameters available from 450mm upwards
- Can be installed in a wide range of soil and rock conditions
- Minimal settlement and deformation
- Minimum vibration
Quality assurance
We use a variety of quality assurance methods for our products including top down and integrity testing, bottom bi-directional pile load tests, and digital recording and logging of the execution parameters.
Related techniques
Related projects
Infrastructure
Avenue 105 / Shaikh Isa Bin Salman Causeway
Foundation of dual carriageway bridge comprising of 58 no. bored piles for the abutments and pier, to a depth of 26m. The scope included pile testing to ensure structural integrity.
Industrial
MSSD Shops Expansion Facilities
Simultaneous delivery of bored piling works at two MSSD facilities, overcoming diverse ground conditions through controlled execution, rigorous quality control, and coordinated resource management.
Residential
Bilaj Al Jazayer
A 1.3 million square meter mixed-use sustainable city focusing on a holistic beachfront lifestyle.
Residential
The Line Project in NEOM
Keller’s entry into large-diameter deep foundations in the Middle East was marked by the Line project. Operational excellence was achieved through the deployment of new LB45 rigs and the combined expertise of global and local teams, demonstrating Keller’s Global Strength and Local Focus.
Industrial
C3/C4 Refrigeration and Tanks Facilities
This project underscored the importance of adaptive planning, robust contractual frameworks, and proactive risk management in complex environments.