A cost-saving value engineered solution with multiple products successfully achieved the projects design objectives and completion time while working close to live underground utilities.
The project
The Mid Island Parkway is a significant Infrastructure initiative aimed at enhancing connectivity and mobility across the city. The project includes construction of bridges, 5-lane wide highways and essential utility networks.
The challenge
The key challenge was delivering large-scale ground improvement within a demanding programme, while safely managing live utilities that were crossing the work area, and running adjacent to it. The ground improvement objectives were to improve bearing capacity within acceptable settlement limits and to mitigate liquefaction potential of soils during a seismic event.
The solution
Keller designed a time saving value engineered solution for ground improvement including mitigation of liquefaction potential. Multiple technique solution was applied including Vibro Stone Columns, Dynamic Replacement and Rigid Inclusions. The project was successfully handed over by performance testing for work acceptance and within the scheduled completion time.