Vibro Replacement ground improvement successfully delivered for an educational campus expansion in Ras Al Khaimah, treating loose soils beneath academic buildings, utility blocks, and sports facilities.
The project
Al Hamra Campus is a secondary school expansion by Ras Al Khaimah Academy, developed to meet the growing educational needs of the Al Hamra community.
The challenge
The key challenge was to carry out the works adjacent to an operational school, with minimal disruption to daily activities while safeguarding live water and electricity utilities. In addition, the works had to be completed within a tight programme to meet the urgent need for the campus expansion.
The solution
Keller designed a ground improvement solution using Vibro Stone Columns. To minimise vibrations, a high-frequency vibrator with bottom stone-feed, mounted on Keller’s customised VIBROCAT rig, was used. The design objectives of improving bearing capacity beneath isolated and strip foundations and mitigating liquefaction potential were verified through a testing regime including load tests.