Cost and time savings were achieved by installing DSM columns from basement level below to support high stress points below the mat foundation as an alternative to piles.
The project
The Sheraton hotel renovation program included the construction of a new building with a basement founded on mat foundation and a car park building adjacent to it.
The challenge
The subsurface profile comprised loose sand layers overlying a very stiff silt layer, with very weak calcisiltite rock encountered at around 8.0 m depth. The unimproved ground could not achieve the modulus of subgrade reaction under the high stress nodes on the mat. The works were additionally challenged by the peak summer period, with temperatures reaching 50°C.
The solution
Keller designed 1.0 m diameter DSM columns using water-cement grout as an alternative to piling. The treatment was designed for a UCS of 2.5 MPa, achieving the required Ks values beneath heavily loaded columns, while the achieved DSM strengths exceeded twice the design requirement. Hot weather grouting was successfully managed using chilled mixing water and regular flushing of grout hoses.