Through value engineering, Keller developed a more sustainable solution, reducing the Vibro Replacement quantity by 45% and incorporating Dynamic Compaction to deliver significant cost and time savings while successfully achieving the specified performance criteria.
The project
The DPE Sunrise project comprises several key initiatives aimed at enhancing Dubai’s energy infrastructure. Ground improvement works were required to provide suitable foundation support for the Sunrise processing facility.
The challenge
The works were executed adjacent to an operational gas plant and live gas pipelines, requiring strict vibration control and continuous monitoring. The soil characteristics were slightly silty sands with fines less than 10% with no ground water. The relative densities showed an increasing trend but with wide variation in depth. The multiple contractors working simultaneously added further complexity to the site operations.
The solution
Keller adopted Dynamic Compaction as the optimal solution replacing 45% of Vibro Replacement zones for deep ground treatment, with controlled platform preparation by Rapid Impact Compaction. Temporary overfilling enabled the safe and effective compaction of slope areas. Comprehensive vibration monitoring and mitigation measures were implemented to protect adjacent gas facilities and live utilities. Mass backfill in layers and slope areas were successfully compacted to depths exceeding 15 m, safely with no LTIs.
Project facts
Owner(s)
Keller business unit(s)
Market
Expertise used
More Information