A secant pile wall consists of overlapping (secant) piles to form structural or cutoff walls and achieve the required water tightness. The design can incorporate steel bar or beams for reinforcement and anchors can provide additional lateral support, if needed.
This technique involves construction of concrete columns with a bottom-feed, down-hole vibratory probe to transfer loads through weak strata to a firm underlying stratum.
Dynamic replacement is a variation on dynamic compaction and uses the energy of a falling weight to drive large diameter granular columns into cohesionless soils and fills.
Jet Grouting uses high velocity fluid jets to construct cemented soil of varying geometries in the ground.
Ground anchors transfer tensile loads and consist of an anchor head, a free length and a bond length. The free length enables the anchor to be, a big advantage for excavation pits with very low horizontal deflections.
Single bore multiple anchor (SBMA) are ground anchors with multiple (more than one) bonds.
Contiguous pile walls consist of piles arranged in a way that a gap remains between the piles. Where required the soil between the piles can be stabilised during excavation by either installing timber lagging in front of the excavated soil or by building a reinforced shotcrete or concrete block…
Sheet piling retains soil, using steel sheets with interlocking edges and is applied using both vibratory and vibration-free installation rigs.