Skip to main content
+971 4213 58 00
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Deep soil mixing - wet method
Deep soil mixing - dry method
Dynamic compaction
Dynamic replacement
Mixed modulus columns CMM ®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro stone columns
Prefabricated Vertical Drains (PVD)
Grouting
Cavity / bulk / mine fill grouting
Compaction grouting
Compensation / fracture grouting
Soilcrete® (Jet Grouting)
Permeation grouting
Deep foundations
Driven cast in-situ piles
Driven precast piles
Bored piles
Bored piles / drilled shafts - cased
CFA piles (auger cast)
Micropiles
Earth retention
Anchors - single bond length
Contiguous pile walls
SBMA
Secant pile walls
Sheet piles
Soil nails
Solutions
Improve bearing capacity
Ground improvement
Heave control
Heavy foundations
Liquefaction mitigation
Re-levelling structures
Underpinning
Excavation support
Stabilisation
Mine stabilisation / void filling
Sinkhole / Karst stabilisation
Seepage control
Slope stabilisation
Remediation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Quality
Supporting our women
Employment practices
Sustainability
About us
Our history
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Dubai Harbour
Project
Dubai Harbour Vibro compaction of 7 million m³ of sand across an area 380,000 m² of land. Dubai Harbour - United Arab Emirates The project The new 20-million-square-foot Dubai Harbour, which will sit…
/projects/dubai-harbour
PVD Port Said
Project
PVD Port Said Installation of 82,500 KM of Prefabricated Vertical Drains, that would run 2.1 times around the world! Keller PVD Project, Egypt PVD Port Said, Egypt The project Port Said adjacent to…
/projects/pvd-port-said
Upper Zakum Islands
Project
Upper Zakum Islands A total of 27 million m³ of calcareous sands were compacted, that is about 11 times as big as the Great Pyramid of Giza! Upper Zakkum Islands, Keller The project Dredging and…
/projects/upper-zakum-islands
Doha Metro
Project
Doha Metro Keller has worked on several stations on the Gold and Red line. Doha Metro, Keller The project The Doha metro network covers 85km and is part of Qatar Integrated Rail Project (QIRP) that…
/projects/doha-metro
Al Zour Refinery
Project
Al Zour Refinery An optimized and smart design with a wider grid resulted in considerable cost savings for our client. Al Zour Refinery - Keller The project The client plans to build a new LNG…
/projects/al-zour-refinery
Bahrain International Airport - Modernization Program
Project
Bahrain International Airport - Modernization Program ''The client was pleased with the substantial cost savings and time due to Keller's alternative design.'' Bahrain…
/projects/bahrain-international-airport-modernization-program
Al Taweelah Alumina Refinery
Project
Al Taweelah Alumina Refinery Al Taweelah alumina refinery is the first in the United Arab Emirates and only the second in the Middle East. The plant converts bauxite into alumina, the feedstock for…
/projects/al-taweelah-alumina-refinery
Lifting of Settled Crude Oil Tank
Project
Lifting of Settled Crude Oil Tank Ground improvement and remediation works for a crude oil tank at a tank farm on an island. grouting works including compensation and cavity grouting and…
/projects/lifting-settled-crude-oil-tank
Marassi Al Bahrain
Project
Marassi Al Bahrain Design and execution of piling works for a shopping mall, two hotels and five residential towers, in Diayar Al Muharraq. design and install bored piles for mixed-use development…
/projects/marassi-al-bahrain
TUBLI STP Expansion - Phase 4
Project
TUBLI STP Expansion - Phase 4 Design and installation of a secant pile wall (SPW) for Inlet Pumping Station and Inlet Collection Chamber and the design and installation of vibro replacement (stone…
/projects/tubli-stp-expansion-phase-4
Sumed - Ain Sukhna Product Hub Lot 2
Project
Sumed - Ain Sukhna Product Hub Lot 2 Design and construction of stone columns to support 8 storage tanks of diameters 38m to 55m, at a facility in Ain Sukhna, Egypt. design and construction of stone…
/projects/sumed-ain-sukhna-product-hub-lot-2
BAPCO Modernization Program
Project
BAPCO Modernization Program One of the largest projects undertaken in Bahrain with the objective of increasing refining capacity, enhancing the product slate and improving energy efficiency.…
/projects/bapco-modernization-program
Crude Flexibility Project
Project
Crude Flexibility Project Ruwais refinery expands its processing capacity. deep soil mixing using the wet method, vibro stone columns and cased bored piles The project ADNOC’s Crude Flexibility…
/projects/crude-flexibility-project
Golden Gate
Project
Golden Gate The Golden Gate aims to be the tallest free-hold residential towers in Bahrain. installation of contiguous pile wall and CIS bored piles The project The Golden Gate project is being…
/projects/golden-gate
Port Fouad Residential Complex
Project
Port Fouad Residential Complex New urban communities set to reduce housing and overcrowding in Egyptian cities. ground improvement using vibro replacement, stone columns The project The Egyptian…
/projects/port-fouad-residential-complex
Amazon Data Center (BAH-054)
Project
Amazon Data Center (BAH-054) Keller was awarded the design and build, cast-in-situ bored piling contract for warehouse in Bahrain. installation of bored piles The project The project BAH-054 (Amazon…
/projects/amazon-data-center-bah-054
New Horizon Liquid Bulk Terminal
Project
New Horizon Liquid Bulk Terminal Vibro Replacement, top-feed method used to install 31.3m deep stone columns. installation of vibro stone columns The project The New Horizon Tank Terminal company, a…
/projects/new-horizon-liquid-bulk-terminal
Etihad Rail - Package 2A
Project
Etihad Rail - Package 2A Keller improves ground for rail line in Abu Dhabi. dynamic compaction and rapid impact compaction The project The Etihad Rail Stage 2&3 Project C303 Package 2A is…
/projects/etihad-rail-package-2a
Qiddiya Project
Project
Qiddiya Project Heavy foundation works for an entertainment megaproject to be established in Riyadh. installing bored piles at qiddiya project The project The Qiddiya development is part of Saudi…
/projects/qiddiya-project
Saudi Kayan Petrochemical Complex
Project
Saudi Kayan Petrochemical Complex Saudi Kayan Petrochemical Complex is one of the largest Petrochemical Plants in the world situated in Jubail Industrial City, Saudi Arabia. installing bored piles…