Skip to main content
+971 4213 58 00
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Deep soil mixing - wet method
        • Deep soil mixing - dry method
        • Dynamic compaction
        • Dynamic replacement
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns
        • Prefabricated Vertical Drains (PVD)
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Soilcrete® (Jet Grouting)
        • Permeation grouting
      • Deep foundations
        • Driven cast in-situ piles
        • Driven precast piles
        • Bored piles
        • Bored piles / drilled shafts - cased
        • CFA piles (auger cast)
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Soil nails
    • Solutions
      • Improve bearing capacity
        • Ground improvement
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
      • Seepage control
      • Slope stabilisation
      • Remediation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Quality
    • Supporting our women
    • Employment practices
    • Sustainability
  • About us
    • Our history
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (209)
  • Project (44)
  • News article (39)
  • Content page (33)
  • Technique (28)
  • Resource (23)
  • Solution (12)
  • Vacancy (12)
  • Office (7)
  • Market (6)
  • Landing page (3)
  • Event (2)
Request a quote
Get assistance
Sinkhole / Karst stabilisation
Solution
Sinkhole / Karst stabilisation Whether natural or man-made soils sometimes present voids that may create sinkholes. Depending on the situation, and the quality of the soils, various techniques can be…
/expertise/solutions/sinkhole-karst-stabilisation
Anchors - single bond length
Technique
Anchors - single bond length Ground anchors transfer tensile loads and consist of an anchor head, a free length and a bond length. The free length enables the anchor to be, a big advantage for…
/expertise/techniques/anchors-single-bond-length
SBMA
Technique
SBMA Single bore multiple anchor (SBMA) are ground anchors with multiple (more than one) bonds. sbma illustration Common uses Excavation support Temporary or permanent slope stabilisation Can be…
/expertise/techniques/sbma
Contiguous pile walls
Technique
Contiguous pile walls Contiguous pile walls consist of piles arranged in a way that a gap remains between the piles. Where required the soil between the piles can be stabilised during excavation by…
/expertise/techniques/contiguous-pile-walls
Sheet piles
Technique
Sheet piles Sheet piling retains soil, using steel sheets with interlocking edges and is applied using both vibratory and vibration-free installation rigs. Sheet piles illustration Common uses…
/expertise/techniques/sheet-piles
Site Manager
Vacancy
Site Manager Dammam, Saudi Arabia Deadline 27 February 2026 Exciting Opportunity: Site Manager with Expertise in Piling and Stone Column Techniques Dammam, KSA Duties & Responsibilities Supervise…
/careers/vacancies/site-manager
Geotechnical Estimation Engineer
Vacancy
Geotechnical Estimation Engineer Dubai, United Arab Emirates Deadline 27 February 2026 Geotechnical Estimation Engineer to prepare competitive cost estimates and tenders while working closely with…
/careers/vacancies/geotechnical-estimation-engineer
Geotechnical Design Engineer
Vacancy
Geotechnical Design Engineer Dubai, United Arab Emirates Deadline 27 February 2026 Geotechnical Design Engineer, working closely with clients to design soil improvement solutions and deliver tailored…
/careers/vacancies/geotechnical-design-engineer-0
Junior Design and Estimation Engineer
Vacancy
Junior Design and Estimation Engineer Dammam, Saudi Arabia Deadline 30 April 2026 Keller KSA is seeking a motivated Junior Design and Estimation Engineer to support tender preparation, provide…
/careers/vacancies/junior-design-and-estimation-engineer

Pagination

  • Previous page ‹‹
  • Page 11
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Grundbau GmbH

Registered in Dubai, United Arab Emirates
Reg no. 62693

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube